This page covers many of the top questions about the Brook Mine project. It reflects Ramaco’s ongoing commitment to transparency, and desire to keep the public and its shareholders informed about the project.
LEGAL NOTE: This FAQ contains forward‑looking statements, including statements about expected development timelines, production, costs, economics, grades, pricing, market demand, permitting, and strategy. Actual results may differ materially due to risks and uncertainties, including those described below and in our SEC filings. We undertake no duty to update these statements. See our full cautionary statement regarding forward-looking statements and reserve, resource and exploration target statements below.
Project basics
Where is Ramaco’s Brook Mine located and how were rare earths and other critical minerals discovered?
- The Brook Mine is in northern Wyoming, approximately 9 miles northwest of Sheridan and 6 miles east of Ranchester. Rare earth elements (REEs) and other critical minerals were discovered following an extensive core drilling and chemical analysis campaign conducted by the Company in collaboration with the U.S. Department of Energy’s National Energy Technology Laboratory (NETL). At the time, roughly 7 years ago, NETL was in the process of doing a national assessment to find heavy rare earth elements for national defense purposes.
- According to NETL, this discovery included evidence of concentrations of magnetic rare earth elements such as neodymium, praseodymium, terbium, and dysprosium. The initial determination was supported by the Technical Report Summary prepared by Weir International discussed below.
- Our estimates of rare earth and other critical minerals at the Brook Mine are reported as in-place inferred mineral resources. Inferred mineral resources are not mineral reserves and do not have demonstrated economic viability. See the cautionary statement regarding forward-looking statements and reserve, resource and exploration target statements below.
- NETL played a pivotal role by providing scientific expertise and conducting independent analyses that supported the evaluation of the project. The critical minerals in the Brook Mine deposit are located in the coal seams and the enclosing sedimentary rocks.
Is Ramaco’s Brook Mine permitted?
- Yes. The Brook Mine spans more than 15,800 acres, with roughly 4,500 acres fully permitted for coal mining. Permitting for the mine has been overseen by the Wyoming Department of Environmental Quality’s Land Quality Division, which renewed Ramaco’s mining permit for a second 5-year term in July 2025, affirming the Company’s compliance with environmental and operational standards.
- Ramaco is actively working on plans to expand its ability to mine coal and increase the size of the permitted acreage at the Brook Mine. To support this strategy, the Company will be working with both state and federal agencies to secure expanded permit authority including reviewing recent Presidential and Secretary Executive Orders, including Presidential Executive Order 14154, Unleashing American Energy and other opportunities to expedite and simplify the permitting approval process.
Is the Brook Mine on private land or federal land?
- The Brook Mine is situated on privately controlled land, encompassing more than 15,800 acres of Ramaco-owned and leased mineral holdings in Sheridan County, Wyoming. The owned property was acquired from the Sheridan-Wyoming Coal Company in 2011. Additionally, Ramaco has engaged with federal agencies—including the Permitting Council and Bureau of Land Management (BLM)—to facilitate approval for exploration and potential development on adjacent federal lands.
How is the Brook Mine different than traditional hard-rock REE mining?
-
The Brook Mine distinguishes itself from traditional hard rock mining by potentially offering a more accessible and environmentally responsible pathway to rare earth element (REE) recovery. Unlike hard rock deposits that are often accompanied by elevated radioactive elements, the Brook Mine’s REEs — all of which are inferred mineral resources — are hosted in soft carbonaceous strata and coal seams within Wyoming’s Powder River Basin.
-
Moreover, the inferred mineral resource contains both light and heavy REEs — including high-value elements such as dysprosium, and terbium — as well as critical minerals such as gallium, germanium, and scandium, all with minimal radioactive elements that can be associated with other types of REE deposits.
What is the carbochlorination flowsheet and what does it mean for the project?
- In February 2026, Ramaco announced the development of a proprietary carbochlorination flowsheet, a change from the hydrometallurgical solvent extraction process modeled in the study prepared by Fluor Corporation. Carbochlorination is a proven high-temperature industrial process, and the dominant technology currently used in titanium manufacturing.
- Ramaco believes the new flowsheet offers several key advantages including expanded product suite, ability to extract rare earths from the coal, simplified logistics, and reduced complexity compared to solvent extraction.
- Under the new flowsheet, high-purity gallium, high-purity alumina (HPA), and high-purity quartz (HPQ) become potential products from the Brook Mine. These are all high-value materials used in semiconductors, renewable energy, and other advanced applications.
- Scandium oxide remains a product in the new flowsheet, while the balance of rare earth elements are processed via a simplified route to produce mixed rare earth carbonate (MREC) for sale to third-party refiners, eliminating the technically complex and costly solvent extraction separation process previously envisioned.
- Hatch Ltd. is engaged to design the new flowsheet that will be incorporated into a revised Initial Assessment, followed by a Pre-Feasibility Study (PFS).
Development
Has Ramaco started active mining at the Brook Mine?
-
Yes, Ramaco officially broke ground on the Brook Mine in Sheridan, Wyoming on July 11, 2025, and has actively mined the Monarch seam. As of October 2025, Ramaco had mined sufficient projected quantities of coal and carbonaceous material to meet the Company’s near-term needs to fully supply the pilot processing facility currently under construction.
-
Additional exploration activity is expected to occur as needed to meet future pilot or commercial processing needs and coal sales demand.
-
The groundbreaking ceremony was attended by prominent federal and state leaders, including U.S. Secretary of Energy Chris Wright, United States Senators John Barrasso and Cynthia Lummis, United States Representative Harriet Hageman, and Wyoming Governor Mark Gordon.
-
Ramaco’s Brook Mine is notable for its inferred mineral resource of rare earth elements and other critical minerals, which are essential for advanced technologies and national defense. If successfully developed, the mine is expected to play a key role in helping to establish a secure, domestic supply chain for strategic minerals in the U.S. Inferred mineral resources are not mineral reserves and do not have demonstrated economic viability.
What REEs and other critical minerals have been found in the Brook Mine deposit?
- The Brook Mine is estimated to host an inferred mineral deposit of REEs and other critical minerals embedded in coal seams and carbonaceous clays and shales. According to studies prepared by qualified persons, the Brook Mine contains inferred mineral resources of both light and heavy magnetic REEs — including neodymium (Nd), praseodymium (Pr), dysprosium (Dy), terbium (Tb), yttrium (Y) and samarium (Sm) — which are essential for permanent magnets, lasers, and defense systems.
- In addition, the Brook Mine includes inferred mineral resources of high-value critical minerals such as gallium (Ga), germanium (Ge), and scandium (Sc), which are used in semiconductors, aerospace alloys, and advanced communication technologies.
What role does the production of Scandium play in the project?
- The Brook Mine project has the potential to be a domestic producer of scandium. The United States is reportedly 100% reliant on imports, mainly from China, and there is currently no domestic recycling capacity.
- While the world scandium market is small today, experts indicate demand is limited due in part to the fact that there is currently no reliable large-scale Western supply available, as almost all supplies are sourced from China.
Has Ramaco started construction on the Pilot Plant facility?
- Yes, Ramaco officially broke ground on the facility for its pilot processing plant and laboratory in October 2025. This marked the launch of site development activities for the facility, aimed at converting carbonaceous material into high-purity critical mineral products, including the targeted rare earths. All required local and county zoning permits have now been issued; high voltage electrical power installation to the site has been completed; geotechnical work for the facility’s foundation has been completed and site excavation has begun. Ramaco has also awarded a design build contract for the facility.
What is a rare earth and critical minerals processing Flow Sheet?
-
A rare earth and critical minerals processing flow sheet is a detailed diagram or plan that outlines the steps and equipment used to extract, separate, and refine rare earth elements (REEs) and other critical minerals from raw ore.
-
The flow sheet is essential for designing pilot and commercial-scale facilities, estimating costs, and ensuring technical feasibility.
-
It typically includes stages such as:
-
Ore handling and comminution (crushing and grinding)
-
Extraction (e.g., pre-treatment and leaching)
-
Purification (by various chemical methods)
-
Separation of individual rare earth oxides (solvent extraction and ion exchange)
-
Final product recovery (precipitation, finishing and packaging)
-
Waste management (effluent treatment and filtration.
-
What is the Initial Assessment (IA) prepared by Fluor and why did Ramaco release a Summary of the IA?
-
The Initial Assessment (IA) prepared by Flour is a conceptual study of early-stage technical and financial factors used to evaluate the potential viability of a Brook Mine project. The IA was not prepared in accordance with Regulation S-K Subpart 1300 requirements as the mineral resource estimates are not mineral reserves and do not meet the threshold for reserve modifying factors that would allow for conversion to mineral reserves.
- Ramaco released a summary of the IA for the Brook Mine via a Form 8-K filing and a shareholder letter on July 1, 2025, and made it available on the Company’s website. The Summary presented Fluor’s preliminary analysis on the viably of the Brook Mine project.
-
Ramaco released a summary of the Fluor report findings that omitted proprietary information considered intellectual property. The Fluor report summary was followed by the release of the Initial Assessment Technical Report Summary prepared by Weir.
How much coal is being mined at the Brook Mine?
-
As of October 2025, initial mining at the Brook Mine has generated sufficient projected quantities of coal and carbonaceous material to meet the company’s near-term needs to fully supply the pilot processing facility currently under construction, with full pilot operations expected to begin in 2027. The thermal coal is also being marketed for sale for use in electric power generation.
-
Additional mining activity will occur as needed to meet future pilot and commercial processing needs and coal sales demand.
While Ramaco is constructing the pilot processing plant and facility, is the Company testing any of the coal and carbonaceous material that it is mining at the Brook Mine?
- Yes, Ramaco has engaged multiple external labs to conduct mineralogical analysis to understand chemical and physical properties, as well as advanced processing test work for the company’s exploration-phase rare earth project.
- Together, these organizations are executing a comprehensive testing program that includes extraction, flow sheet simulations, and recovery modeling to optimize the process flowsheet. The results of this work will inform the design of Ramaco’s pilot processing facility and support the upcoming updated Initial Assessment and prefeasibility study for potential future commercial-scale critical mineral production.
Finances
What are research analysts saying about METC?
Currently, Ramaco Resources has 9 Wall Street analysts which have provided research coverage offering 12-month price targets in the last 3 months. The average price target is $28 with a high forecast of $50 and a low forecast of $15. The average price target represents a ~93% change from the last quoted price of $14.49 on April 27th.
Of the analysts which cover Ramaco, 2 provided coverage with a Strong Buy recommendation, 5 with a Buy recommendation, and 2 with a Hold recommendation with a consensus rating of Moderate Buy.
What is Ramaco Resources’ current liquidity position?
As of December 31, 2025, the Company had liquidity of $521.0 million, consisting of approximately $440.3 million of cash plus $80.7 million of availability under our revolving credit facility.
What recent financing initiatives have Ramaco completed?
- On Dec. 30, 2025, the Company amended its existing Revolving Credit Agreement to increase the overall commitments under the Facility to $500 million, including a $350 million revolving commitment and a $150 million accordion feature. The commitments under the previous Facility were $200 million with a $75 million accordion feature. In addition, the maturity date was extended from 2029 to 2030.
- On November 7, 2025, the company issued $345 million in 0% convertible senior notes due 2031. This included a capped call feature which effectively limits dilution to the Company upon conversion of the notes at maturity in six years unless the stock price exceeds approximately $55 per share.
- On August 7, 2025, Ramaco raised $200 million through an equity offering of over 10.6 million METC shares sold at $18.75 per share.
- On July 23, 2025, the Company issued $65 million in senior unsecured notes due 2030 (before expenses), while using roughly $35 million to pay off its senior unsecured notes due 2026.
Who managed Ramaco’s recent financing transactions?
- Goldman Sachs & Co. LLC and Morgan Stanley & Co. LLC served as book-running managers for both the convertible bond and equity offerings.
- Lucid Capital Markets led the baby bond offering.
- KeyBank served as the Administrative Agent for the Revolving Credit Facility. KeyBank and Truist served as Joint Lead Arrangers and Joint Book Runners for the Facility.
How does this liquidity impact Ramaco’s strategic plans?
The enhanced liquidity allows Ramaco to accelerate the commercial development of rare earth elements and critical minerals from its Brook Mine, while preserving balance sheet flexibility to pursue disciplined capital allocation initiatives, including opportunistic repurchases under its previously announced share buyback program. The Company remains committed to prudent financial management and long-term shareholder value creation.
How will the funds from these offerings be used?
The proceeds from these financing initiatives will primarily fund the development of Ramaco’s rare earth elements and critical minerals project. Additionally, the funds will support strategic growth opportunities and general corporate purposes.
Partners
What role has Weir International played in the Brook Mine project and what is the Technical Report Summary prepared by Weir?
-
Weir is a globally recognized mining, geology, and energy consultancy that has played a pivotal role in advancing Ramaco’s initiatives at the Brook Mine. Qualified persons with Weir have delivered multiple technical report summaries, including an update in 2025 that included estimates of the total rare earth elements and other critical minerals in an inferred mineral resource.
-
Their work has been instrumental in characterizing the scale, quality, and potential commercial viability of the inferred mineral resource. Weir’s expertise spans geological assessments, reserve modeling, and technical reporting, and their collaboration with Ramaco has helped advance the project.
-
The TRS prepared by Weir for the Brook Mine was filed as Exhibit 96.1 of the Company’s Current Report on Form 8 K filed with the SEC on September 18, 2025.
Has Ramaco hired a firm to design and build the Pilot Plant?
-
Yes, Ramaco hired Zeton Inc., a leading designer and builder of pilot plants, with more than 1,000 successful projects completed across 45 countries since its founding in 1986. Zeton specializes in modular, scalable systems that bridge the gap between bench-scale research and full-scale production, offering integrated design-build services from concept to commissioning. Zeton’s expertise spans a wide range of industries, and its facilities in Canada and the Netherlands enable rapid, cost-effective construction of custom pilot plants tailored to each client’s process technology.
-
Detailed design of the downstream pilot plant modules at Zeton will commence following completion of a new carbochlorination-based basic engineering package.
Who is developing the Flowsheet and how does this fit into the Prefeasibility Study?
- Ramaco has retained Hatch Ltd. to complete a revised Initial Assessment incorporating new carbochlorination flowsheet, followed by preparation of a pre-feasibility study.
- Hatch is a global, employee-owned engineering and management consultancy headquartered in Mississauga, Ontario, Canada. With more than 10,000 professionals across 70+ offices worldwide, Hatch specializes in complex projects in the metals and minerals, energy, and infrastructure sectors. The company is renowned for its expertise in process design, pyrometallurgy, hydrometallurgy, project delivery, and technology development, particularly in areas like rare earth element processing.
- Hatch’s scope includes:
- Designing the pilot processing facility
- Developing and optimizing the process flow sheet
- Coordinating test-work programs with national and private laboratories
- Integrating downstream processing and purification strategies to produce final products
Has Ramaco received any financial support from the State of Wyoming for the Brook Mine project?
-
Yes, Ramaco was awarded a $6.1 million matching grant from the Wyoming Energy Authority. The grant was authorized by Governor Mark Gordon and is part of the state’s initiative to promote energy innovation and economic development. The funding is designated to help design, construct, and equip Ramaco’s pilot processing facility for rare earth elements (REEs) and other critical minerals at Ramaco’s Brook Mine near Sheridan, Wyoming.
-
This facility will deploy innovative technologies to extract and produce concentrated mixed rare earth oxides from Wyoming’s coal deposit and other carbonaceous materials, supporting the development of a domestic supply chain for strategic minerals.
Who is the Fluor Corporation and what is their expertise?
- The Fluor Corporation is a Fortune 500 engineering, procurement, and construction company headquartered in Irving, Texas, with more than 26,000 employees worldwide. The company operates in over 40 countries across North America, South America, Europe, Africa, the Middle East, Asia-Pacific, and Australia, delivering complex infrastructure and industrial projects globally.
- Fluor has extensive expertise in rare earth elements (REEs) and critical minerals projects. Through its Mining & Metals business line, Fluor has established a dedicated team focused on the growing demand for minerals essential to clean energy, advanced manufacturing, and national security, including lithium, cobalt, nickel, and rare earths like neodymium and dysprosium.
How has the U.S. Department of Energy’s National Energy Technology Laboratory been involved in the Brook Mine project?
-
Since inception, NETL has been instrumental in the Brook Mine project in Wyoming. It was involved in the original discovery of the Brook Mine rare earth (REE) deposit and has continued to partner with Ramaco on a variety of scientific and technical aspects of the project.
-
One current area of cooperation is that Ramaco is partnering with NETL to apply its GAIA artificial intelligence platform for REE mapping and validation. This collaboration helped support the understanding of the occurrence of the Brook Mine's REE and other critical minerals. NETL’s large data modeling and heat maps have guided the Company's mine planning,
-
In support of this effort, the Company has also entered into multiple agreements, including with independent third parties for sample preparation and AI-driven exploration. A recently announced Cooperative Research and Development Agreement (CRADA) between the Company and NETL will soon support continued collaborative research on REE processing, resource deposit modeling, and potential commercialization strategies.
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS AND RESERVE, RESOURCE AND EXPLORATION TARGET STATEMENTS
Certain statements contained in this FAQ constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements, including statements about expected grades, market demand, permitting, and strategy, represent Ramaco Resources’ expectations or beliefs concerning, among other things, Ramaco’s plan for the Brook Mine, guidance, future events, anticipated revenue, future commodity demands, macroeconomic trends, the development of ongoing projects, and it is possible that the results described in this FAQ will not be achieved. These forward-looking statements are subject to risks, uncertainties and other factors, many of which are outside of Ramaco Resources’ control, which could cause actual results to differ materially from the results discussed in the forward-looking statements. These factors include, without limitation, unexpected delays in our current project evaluation activities, , increased government regulation of coal in the United States or internationally, the impact of tariffs imposed by the United States and foreign governments, the further decline of demand for coal in export markets and underperformance of the railroads, the Company’s ability to successfully develop the Brook Mine REE/CM project, including whether the Company’s plans for exploration programs and advanced metallurgical studies are realized, and the development of a pilot plant. Any forward-looking statement speaks only as of the date on which it is made, and, except as required by law, Ramaco Resources does not undertake any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. New factors emerge from time to time, and it is not possible for Ramaco Resources to predict all such factors. When considering these forward-looking statements, you should keep in mind the risk factors and other cautionary statements found in Ramaco Resources’ filings with the Securities and Exchange Commission (“SEC”), including its Annual Report on Form 10-K and Quarterly Reports on Form 10-Q. The risk factors and other factors noted in Ramaco Resources’ SEC filings could cause its actual results to differ materially from those contained in any forward-looking statement.
This FAQ also includes various statements about our mineral resources which are derived, for the most part, from the technical report summary. The terms “mineral resource”, “mineral reserves” and “initial assessment” are defined and used in accordance with subpart 1300 of Regulation S-K. Under subpart 1300 of Regulation S-K, mineral resources may not be classified as “mineral reserves” unless the determination has been made by a qualified person that the indicated and measured mineral resources can be the basis of an economically viable project. You are specifically cautioned not to assume that any part or all of the mineral resources will ever be converted into mineral reserves, as defined by the SEC. You are cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Inferred mineral resources are estimates based on limited geological evidence and sampling and have a too high of a degree of uncertainty as to their existence to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Estimates of inferred mineral resources may not be converted to a mineral reserve. In particular, our estimates of rare earth and critical minerals at the Brook Mine are reported as in-place inferred mineral resources. Rare earth and critical minerals is a new initiative for us and, as such, has required and will continue to require us to make significant investments to build out our rare earth and other critical mineral capabilities. As a new facet of our business, there are heightened risks and uncertainties, and there is no assurance that we will be able to successfully develop the Brook Mine into a commercial scale mine. We have little to no demonstrated track record of commercial, operational or financial success outside of our core business, and given the uncertainties associated with rare earth and critical minerals and the mining thereof, we cannot assure you that this initiative will be successful. . The estimates derived from the technical report summary are, in part, a function of the quality and quantity of available data at the time such report was prepared; however, the estimates should be accepted with the understanding that with additional data and analysis subsequent to the date of the report, the estimates may necessitate revision, which may be material.